Bank / correction control
WOW 2 · the fabric is wrong
A correction is a governed workflow, not a silent overwrite. The downstream condition list changes only after an officer records the challenge.
Original assertion · confidence 0.91
Land parcel 214/2B is classified industrial; land-use conversion is complete.
Source: district land-record extract · 14 Mar 2026. The assertion looks strong until a later record and field inspection arrive.
Why this matters
The correction path is designed to catch stale data before a sanction becomes a loss. ·
The correction path is designed to catch stale data before a sanction becomes a loss. ·